A) Present Employment Details:

 

Work Place Address                  : TATA HONEYWELL LTD.

                                                               55-A/8 & 9, Hadapsar Industrial Estate

                                                               Pune-411 013 (India)              

Company Business                                : Control & Instrumentation system supplier.

 

Job Title                                                : Lead Project Engineer Project Engineering and application software development group.

                                               

                                                                

           

 

C) EDUCATIONAL QUALIFICATIONS:

 

Bachelor of Engineering (Electrical 4 year course) from Govt. College of Engineering Pune, University of Pune INDIA.

 

Diploma in Business Management, Pune University INDIA

 

MicroProgramming and Micro Processing at IISc, Bangalore, INDIA.

 

Year of Graduation                                 : 1983.

 

 

 

D) WORK EXPERIENCE:

 

From - 1988 to till date: 12 Years Control & Instrument Engineer in application software development group.

Tata Honeywell LTD: Control and Instrument system supplier. Honeywell make TPS / TDC 3000 system.

 

From - 1987 to 1988: 1 Year as control & Instrument Engineer for Erection and Commissioning of power plant

Gujarat Instrument LTD: Control and Instrument system supplier. MOD300 series Taylor control system.

 

From - 1983 to 1987: 4 Years as C&I Systems consultant

Tata Consulting Engineers: One of the top most consultants in India.

 

 

 

 

 

 

E) BRIEF DESCRIPTION OF JOB PROFILE:

 

 

As a Control & Instrument Engineer (1988 ~ till date with Honeywell)

 

Ø       Preparation of instrument list, I/O list, P&ID take off, Database generation.

Ø       Hardware Engineering, Bill of Materials for DCS system, Marshalling design wiring and checking.

Ø       Preparation of Hardware Design Manual, LCN/UCN Connection diagrams, Plant information network connection diagrams. Power supply distribution design and wiring diagrams. Control Panel design layout and wiring diagrams, mimic diagrams, front layout and internal arrangement.

Ø       Preparation of Software Design Manual. LU/PU calculations, system loading, I/O segregation, Plant control philosophy finalization.

Ø       Application software implementation. System configuration, NCF, Point database building, logic implementation, close loop controls implementation, logs and reports implementation, graphics / man machine interface preparation and implementation, history / trends configurations etc.

Ø       Implementation of Boiler Controls in HPM

Ø       Implementation of Motor Controls in LM, FSC, Triconex and HPM.

Ø       Implementation of Burner Management System (2X350MW coal fired boiler) in FSC

Ø       Implementation of graphics / MMI in GUS, FixDMacs, Scan3000, PlantScape.

Ø       System Architecture diagrams Functional Block Diagrams preparations.

Ø       Installation and Configuration of Operating Systems Software.

Ø       Factory Acceptance Test (FAT) procedure preparations. Factory Acceptance Testing using simulators.

Ø       Conducting FAT and sign off with customer.

Ø       Implementation of various quality procedures such as ISO9000 adopted by the company.

Ø       Project Planning, estimation, control and monitoring.

Ø       Man power scheduling, controlling and completing the project with in budgeted man hours.

Ø       Remote Engineering, managing day-today deliverables and meeting Honeywell's requirements remotely.

 

As a C&I Erection and Commissioning Engineer. (1987 ~ 1988 with Taylor)

 

Ø       Supervision of Field Instrument installation, erection, and calibration.

Ø       Supervision of cable laying, glanding and termination.

Ø       Site Acceptance Test (SAT) procedure preparation and conducting SAT.

Ø       Testing of various motor controls and commissioning.

Ø       Close loop control checking, testing, commissioning, and loop tuning.

Ø       Logs and reports checking.

Ø       Handing over the system and project closeout.

 

 

 

As a C&I Consultant (1983 ~ 1987, with Tata Consulting Engineers)

 

Ø       Basic study of customer requirements. Front end loading. Preparing a package to put all customer requirements together and suggesting a solution. Request for quotes. Evaluation and finalization of vendors. Further detail design and engineering.

·         Design and review of 415V and 6.6KV switch gear motor controls. Switch replacement. Preparation of Control Wiring Diagrams. (CWD)

·         Preparation of logic diagrams for above.

·         Preparation of interconnecting cable schedule

·         Selection and review of combustion and water analyzers. Sample handling systems.

·         Orifice and flow nozzle DP calculations and control valve sizing.

·         Preparation of logic diagrams for open loop controls

·         Preparation of control schemes for close loop controls.

·         Vendor drawing review for various installation and erection drawings of field instruments.

·         Preparation of field instrument hook up diagrams

·         Man Machine Interface Design from P&ID

 

F) EXPERIENCE IN HANDLING PROCESS CONTROL SYSTEMS:

 

HONEYWELL SYSTEMS:

§         LCS 620- 12, 16, 36, 25, 35.

§         SERIES 9000.

§         Single / Multi-Loop Controllers.

§         Honeywell Highway Gateway based systems such as MC, AMC, etc.

§         Honeywell TDC 3000 / TPS DCS system (APM , HPM, SMM, LM, US, USX, GUS, AM CIM, EPLCG, etc)

§         LCN graphics and GUS graphics (MMI)

§         AM / HPM CL, Point Builder, Work-Book, Power application Builder.

§         System configuration software for ordering DCS system (TPC Configurator )

 

SAFETY MANAGEMENT SYSTEMS:

§         Honeywell Safety Management System (FSC101R , FSC102)

§         Ladder programming and power calculations using CEDT software.

§         Triconex  Triple Redundant system (TMR)

 

SCADA (MMI) PACKAGES:

§         Intellution – FIX DMACS, SPECIFIX.

§         Honeywell – SCAN 3000.

§         Honeywell – PlantScape SCADA.

§         Honeywell – PlantScape Process.

 

OTHER SYSTEMS WORKED ON:

§         Rockwell / AB PLC, Control Net, DH Plus, Control Logix 5/80 processor ladder logic programming etc.

 

SAFETY STANDARDS USED:

§         NFPA

§         IEC61508

 

 

G) EXPERIENCE IN COMPUTER RELATED ACTIVITIES:

 

Ø       Knowledge of PC Operating systems such as MS DOS, MS-Windows 95, MS-Windows NT. Trained on Networking, & Communication environment.

Ø       Good Knowledge of MS-Office, MS-Excel, MS-Word, MS-Access etc.

Ø       Electronic mail system software such as MS Exchange, MS outlook, Internet Explorer etc.

Ø       Project Planning software such as MS Project and Primavera.

Ø       Trained on RDBMS Oracle, Front end Visual Basic and programming in C.

Ø       Worked on Visio and AUTO CAD

 

 

H) OVERSEAS ASSIGNMENT:

 

Yamatake Honeywell Japan.

Worked as Project Engineer for Samsung General Chemicals Project in 1989.

In 1997 Yamatake had selected me as a Lead Project Engineer for their biggest refinery project. On successful completion of this project I received best project implementation award for this project.

 

Fluor Daniel Arabia Ltd. Saudi Arabia.

During 1992 ~ 93 I worked on ARAMCO's Marjan Oil and Gas exploration plant as a Honeywell Engineer for DCS system engineering software implementation and plant commissioning.

 

Honeywell Tianjin Ltd. China.

During 1998 ~ 2000 I have worked as Lead project Engineer for Qitaihe 2 X 350 MW Power plant. Scope included complete design engineering software implementation and buyout engineering of the project. I received best Operations Manager of the Year award for this work.

 

 

 

 

 

 

I) BRIEF OVERVIEW OF PROJECTS EXECUTED:

 

1)       Power Plants

 

Ø       2 X 120 MW Sikka Thermal Power Plant Coal Fired Boiler

Ø       2 X 120 MW Jojobera Thermal Power Plant Coal Fired Boiler.

Ø       2 X 350 MW Qitaihe Power Plant China, Coal Fired Boiler

Specific duties performed were detail design, engineering, and software implementation, testing and commissioning.

Burner Management System implementation in Honeywell Safety Manager (FSC and SMM) Boiler Controls implementation in HPM. Motor controls implementation in FSC. GE Alsthom 3 coal mills feeding 6 elevations logic sequence implementation in FSC.

 

2)       Material Handling Plants

 

Ø       1 MTPA Grasim Cement Plant

Ø       1 MTPA Fuller KCP Laxmi Cement Plant

Ø       1 MTPA Gujarat Ambuja Cement Plant

Specific duties performed were detail design and engineering, group sequence operation implementation in LM and development and implementation of MMI.

 

3)       Chemical and Petrochemical Plants.

 

Ø       IHI Algeria LPG Plant

Ø       Incon Palm Oil filtration and refinery Indonesia.

Ø       Bayer India Rubber Plant

Ø       Oil and Gas exploration plant Saudi Arabia.

Ø       Rohit Paper and Pulp quality control systems from Lipke Controls.

 

Specific duties performed were detail design and engineering, batch operation, Plant Emergency shutdown system implementation in Triconex. Implementation of cause and effect diagrams in logic. Logic implementation in AB PLC, control net, DH plus, Control logix, Ladder implementation in 5/80 processor.

 

 

J) AWARDS RECEIVED:

Ø       Best Performance award 1987

Ø       Special Recognition Award 1994-95

Ø       Best Project Management Award

Ø       Best Operations Manager of the year 1999

Ø       Customer appreciation letters received

§         Fluor Daniel Arabia Ltd.

§         Incon Technologies Inc. USA

§         Heilong Jiang Electric Power Co. China.